Beneath a street in Losheim am See, a generational shift in infrastructure took place. Our DN 300 CIPP felt liner was installed in two lengths of 315m and 290m — delivering a technically precise, economically efficient, and long-term rehabilitation solution.
CIPP Felt Liner Solution for Losheim am See
The rehabilitation process involved the use of trenchless technology to install a DN 300 CIPP felt liner in two sections of the existing pipeline. The first section was 315 metres long, and the second was 290 metres long. The CIPP method was chosen due to its effectiveness in renewing old pipelines with minimal disruption. The liner was resin-saturated and inserted into the old pipe, where it was cured in place to form a new, durable pipe.
This method offers both a sustainable and cost-effective solution to extend the service life of the pipeline without the need for open-cut construction. The entire project was completed in just five days, demonstrating the efficiency and rapid turnaround of the trenchless rehabilitation method.
Project Outcome
Trenchless technology was used to install the felt liner, significantly reducing disruption to residents, traffic, and local businesses compared to traditional open-cut methods. The project was executed by the team at DIRINGER & SCHEIDEL ROHRSANIERUNG GmbH & Co. KG, whose precise planning and on-site expertise ensured smooth delivery.
Pipeline Details and Project Summary
Client: D&S Pipe Rehabilitation
Location: Losheim am See, Merzig-Wadern, Saarland, Germany
Scope: Supply DN 300 CIPP Felt Liner for pipe rehabilitation
Length: 315m and 290m
Diameter: DN 300
Liner Type: CIPP Felt Liner
Duration: Five days