In November, Insituform® supplied a CIPP Felt liner for the successful rehabilitation of a 200-metre section of combined sewer on Zweinaundorfer Straße, Leipzig, Germany. This project, carried out on behalf of Leipziger Wasserbetriebe, is part of a larger infrastructure renewal effort across the city. Swietelsky-Faber GmbH Kanalsanierung managed the installation, with Insituform® providing the high-quality CIPP Felt solution and technical support.
The sewer had an egg-shaped profile (1100/1310 x 19mm), requiring a tailored solution that would restore its structural integrity. Insituform® supplied the necessary materials, and the liner was installed and cured using the hot water method, offering a durable and effective rehabilitation solution.
CIPP Felt Liner Solution for Leipzig Sewer Rehabilitation
Insituform® supplied a high-quality CIPP Felt liner with a 19mm wall thickness, specifically designed to restore the structural integrity of the existing sewer. The key steps in this project included:
CIPP Liner Supply
- Insituform® provided a synthetic fibre liner designed for this project, ensuring that the 19mm thick liner met the required specifications for restoring the sewer’s durability.
Hot Water Curing Method
- The liner was installed by Swietelsky-Faber GmbH Kanalsanierung using an inversion tower, and then cured with mobile heating systems using the hot water method.
- This method was ideal for the site’s challenging conditions, including groundwater infiltration and misaligned pipes, ensuring the liner set quickly and seamlessly, forming a durable inner pipe.
Efficient CIPP Felt Installation Setup
Insituform® provided full on-site support, including the supply of a cooling container and installation of a conveyor ramp, ensuring efficient and precise placement of the liner. The setup allowed the Swietelsky-Faber team to position the liner within a few hours, maintaining a fast workflow.
Ergebnis des Projekts
The project successfully restored the sewer’s structural integrity, providing a long-lasting, reliable solution for the local infrastructure. Key outcomes included:
Long-Lasting Solution
The CIPP Felt liner effectively addressed the sewer’s condition, creating a seamless, durable inner pipe that ensures the system’s long-term reliability and performance.
Efficient Execution
With the combined expertise of Swietelsky-Faber GmbH Kanalsanierung and the high-quality CIPP Felt liner from Insituform®, the installation was completed efficiently, minimising disruption to the local community.
Nachhaltigkeit
The rehabilitation contributes to sustainable sewer infrastructure in Leipzig, reducing the need for frequent repairs and extending the service life of the pipeline for many years to come.
Pipeline-Details und Projektzusammenfassung
Kunde: Leipziger Wasserbetriebe
Standort: Zweinaundorfer Straße, Leipzig, Germany
Umfang: Sewer inspection, CIPP Felt lining, hot water curing, post-installation inspection
Länge: 200 metres
Durchmesser: 1100/1310 x 19mm (Egg-shaped combined sewer)
Liner Type: CIPP Felt liner with 19mm wall thickness
Installationsmethode: Hot water curing, Inversion tower installation by Swietelsky-Faber GmbH Kanalsanierung, mobile heating systems
Dauer: Installation and curing completed in just a few days